Before the walls and ceilings close
Agree button positions, lighting circuits, shade pockets, speaker locations and rack space against the room drawings. Have the controls installer, electrician and fit-out team check the same set of plans. Note who supplies power and who installs each interface.
At first fix
Label cables at both ends and keep a record of routes before they are concealed. Check the power and access arrangements for motors and future service work. Take photographs of cable positions where the joinery or ceiling will hide them.
When the equipment is installed
Test each lighting circuit, curtain motor, audio zone and supported climate interface on its own. Agree button labels and scene behaviour with the people who use the rooms. This is the point to adjust a bedside scene that lights the corridor too brightly.
At handover
Walk the property with the room schedule. Operate each scene from the wall and the agreed app or remote. Ask for the final drawings, equipment list, operating instructions and the contact for support. Record outstanding adjustments against specific rooms.
Discuss your installation
Send the property location, plans and the functions you need. Equipment and integration options are confirmed against the project requirements.
Discuss your projectExplore this solution