Mark the places where a connection matters
On the floor plan, mark desks, TVs, touchscreens, family sitting areas and outdoor seating. Tell the installer where video calls drop or streaming breaks up. Strong signal beside the router gives little information about the far bedroom or pool terrace.
Plan wired connections before ceilings close
Use the cabling design to give wireless access points a wired connection back to the network where possible. Check cable routes to fixed AV equipment and allow space, power and ventilation where the network equipment will sit.
Check the finished rooms
Doors, fitted joinery and building materials can change coverage. Ask the installer to test representative devices where they will be used and to check movement between floors. In a garden, agree the exact areas that need coverage and suitable positions for outdoor equipment.
Agree a handover test
Walk through a normal day with the installer. Try a call from the study, stream in the sitting room and check a control panel on the far side of the villa. Keep an equipment schedule and a drawing of the access-point positions for future changes.
Discuss your installation
Send the property location, plans and the functions you need. Equipment and integration options are confirmed against the project requirements.
Discuss your projectExplore this solution